Kkula
Browse Questions » SIMATIC S5 / STEP 5: step 5 - cpu 115u and remote et 100u fault

About User

Questions Asked: 30.3K

Answers Given: 0

0
  • Open
  • New

SIMATIC S5 / STEP 5: step 5 - cpu 115u and remote et 100u fault

SIR  ;
My hardware configuration is one 115 cpu u get I / O from 2 remote stations (ET 100 Distributed I / Os). This 2 remote stations (ET 100u) connect with separate 2 serial links via 308-3UA12 Expansion Unit Interface Module. 
 my fault IS I can not operate  2  et100 u stations Simultaneously .At one time this can operate only one.This Means i stop one manually by ON / OFF switch, then other station can ON.Then i ON the OTHER off station there flashing I / O disable bulb in red. Here I attach i stack and B stack and hardware configuration .
And other is  
In remote stations there display inputs , but after check in online cpu via step 5 software there not display the ' 1 ' statues .
My understanding figure is erase eprom program on 308-3UA12 Expansion Unit Interface Module  .Can it happen ..???  
Can u send me sir COM ET 100 communication software ??? I couldn t  find this software from internet.

0 Likes 0 Favourites 0 Followers 0 Comments
Answers(0)